Changes Happening at Nashville’s BNA Airport
And Mo's Tip To Plan Accordingly
Rideshare Drop-off and Pick-Up Relocated
All Uber and Lyft passengers must now use the Ground Transportation Center for both drop-offs and pick-ups.
Mo's Tip: Allow at least 10 extra minutes for the walk, especially if traveling with luggage or small children.Concourse D Expansion Now Open
A new terminal wing opened July 2025, with five new gates, eight shops and restaurants, a moving walkway, and an outdoor terrace with epic downtown Nashville sunset views.
Mo's Tip: Use this new space for less-crowded seating, dining, or a scenic break during layovers.Terminal Roadway Widening and Construction
Roadways in front of the terminal have expanded from three to four lanes with ongoing work continuing through 2025.
Mo's Tip: Arrive early to account for possible traffic congestion and construction detours.Major Renovation Planned for Concourse A
Concourse A is set for full reconstruction and expansion by 2028. Expect phased construction, interim gate changes, and limited access over the coming years.
Mo's Tip: Double-check your gate before arriving and allow extra time if flying out of Concourse A.Expanded Flight Offerings
BNA now offers 114 nonstop destinations, including recent additions like Reykjavík via Icelandair, plus expanded service from Southwest and Aer Lingus.
Mo's Tip: Call Mo to explore new direct flight options.
Keep Traveling,
Mo